49 Megawatt Solar Farm

Ecosystem Solar Electric Corp. applying for permits to build a 49 MWe Super Peaker. The Super Peaker, a Solar Thermal Electric CSP and Recovered Free Energy Technology, Integrated Storage Component Hybrid Power Plant is to be sited near Boron, a small town located in the vastness of the Southern California Mojave Desert. It will operate 24/7/365 and is estimated to produce over 290,000 megawatt-hours, sufficient to power 45,000 homes and businesses. Construction cost is estimated at $49 million, which is lower than that of a coal-fired power plant. [read more]

Comments (0)

This post does not have any comments. Be the first to leave a comment below.

Post A Comment

You must be logged in before you can post a comment. Login now.

Featured Product

Sierra Instruments, Inc.- InnovaMass. Reinvented.

Sierra Instruments, Inc.- InnovaMass. Reinvented.

Sierra was the first to introduce a combination volumetric vortex and multivariable mass flow meter in 1997. Today, Sierra's completely redesigned InnovaMass® iSeries™ 240i/241i builds on two decades of success measuring five process variables for gas, liquid and steam with one connection. Now, with the latest hyper-fast microprocessors, robust software applications, field diagnostic and adjustment capability, and a new state-of-the-art flow calibration facility, Sierra's vortex iSeries delivers precision, performance, and application flexibility never before possible.