49 Megawatt Solar Farm

Ecosystem Solar Electric Corp. applying for permits to build a 49 MWe Super Peaker. The Super Peaker, a Solar Thermal Electric CSP and Recovered Free Energy Technology, Integrated Storage Component Hybrid Power Plant is to be sited near Boron, a small town located in the vastness of the Southern California Mojave Desert. It will operate 24/7/365 and is estimated to produce over 290,000 megawatt-hours, sufficient to power 45,000 homes and businesses. Construction cost is estimated at $49 million, which is lower than that of a coal-fired power plant. [read more]

Comments (0)

This post does not have any comments. Be the first to leave a comment below.


Post A Comment

You must be logged in before you can post a comment. Login now.

Featured Product

Rolls Battery - Maintenance-Free AGM & GEL Batteries

Rolls Battery - Maintenance-Free AGM & GEL Batteries

With a full range of capacity options (85AH-3300AH) and voltage configurations to choose from, Rolls Battery maintenance-free 2V, 6V & 12V AGM and broad range of 2V GEL models offer a valve regulated lead acid (VRLA) battery option with the same dependable energy storage and heavy-duty construction customers have grown to expect from the Rolls brand for over sixty years. Installed in off-grid, grid-tied or backup float applications, these sealed batteries require minimal ongoing maintenance and provide a versatile energy storage solution for remote or confined installations. Rolls Battery AGM and GEL battery lines deliver superior cycle life and are backed by an industry-leading warranty.