Renewable Power Solutions Inc. announces new no capital requirement large solar power systems

Renewable Power Solutions Inc. announced today the lunching of a new no capitol requirement for photovoltaic systems larger than 100KW for business, non profit and governmental institutions

San Jose CA.

"Solar Power with no capitol investment is the solution for larger photovoltaic projects says Jose Radzinsky CEO for Renewable Power Solutions Inc. a system designer and installer. Renewable Power Solutions Inc. announced today the lunching of a new no capitol requirement for photovoltaic systems larger than 100KW for business, non profit and governmental institutions.

"Large Photovoltaic Projects (100KW or more) are able to get solar install on their roof for no upfront capitol required says Jose Radzinsky. A Power Purchase Agreement (PPA) provides reliable, long-term solar electricity generated on the host's site. The host only pays for the metered electricity delivered at substantially less, over time, than their local utility company would charge.

Featured Product

Flex-Core - Flexible Split-Core Current Transformer

Flex-Core - Flexible Split-Core Current Transformer

The FCL model split-core current transformers have multiple benefits, including a flexible twisting motion for ease of application. Installing a split-core CT means there is no need to disconnect your primary conductor(s) which reduces downtime. Many customizations are available including extended secondary lead wire lengths, various outputs including 5A, 1A, 1VAC, and 0.333VAC, and custom rubber inserts to help center the CT and maintain accuracy. The FCL models can be used in applications up to 720VAC and have an operating frequency from 50Hz to 400Hz.