Group OPDE signs agreement with the Government of Durango for the construction of solar photovoltaic

The first -1 MW power- solar power plant will be built at the Logistics and Industrial Park in Durango (CLIP) and will be fully operational in 2010.

The Governor of the State of Durango (Mexico) and President of the National Conference of Governors CONAGO, Ismael Hernndez Deras, and representatives of the Board of OPDE, Alejandro Chvez and Gustavo Carrero, have signed a collaboration agreement whereby the Spanish solar photovoltaic multinational is committed to study, plan, build and launch during the period 2010-2013, solar farms that will reach a total capacity of 45 MW.


In addition to the Governor of Durango, the signing ceremony was also attended by Esteban G. Rosas; the Under Secretary for Economic Development in Durango, Ruben Ontiveros; The General Coordinator of the Promoter for Strategic Projects in Durango and Theodore Krap; Adviser for Strategic Projects of the Government of Durango.

The first of the 1 MW photovoltaic solar farms that OPDE will build in the area will be located in the Logistics and Industrial Park in Durango (CLIP) and will be fully operational in 2010.

The agreement between Grupo OPDE and the State of Durango also covers the opening of new branches of the companies OPDE, PROINSO, MECASOLAR, in this Mexican region within approximately three years. Durango is one of the 32 federal states of the Republic of Mexico. It is located north of the country and has a population of 1.5 million inhabitants. Noteworthy are the excellent state communications, thanks to heavy investment in infrastructure, enabling communication with the Pacific and Atlantic.

During the visit to Durango and Mexico D.F. Executives from Grupo OPDE also met with Hector Alfonso Dez Rubio, President of the Business Coordinating Council of the State of Durango, with representatives of BANOBRAS (responsible for the financing of strategic projects in Mexico) and the CRE (entity responsible for energy regulation in Mexico).

Both this visit and the signing of the partnership which was the result, among other measures, of the visit by the Governor to company headquarters in Navarra last year and where he had the occasion to ascertain firsthand the history, skills and experience of the Spanish multinational, are held in very high esteem by Grupo OPDE.

With this agreement, the Spanish Group reinforces its presence on the American continent, where it already has its own delegation in Sacramento, California (USA) and where various engineering and supply projects are underway. Greece, Italy, Germany and France are other key countries in OPDEs commitment to internationalization.

Featured Product

Joyce Dayton Corp - Solar Tracking Drive Solutions

Joyce Dayton Corp - Solar Tracking Drive Solutions

Joyce Solar Actuators are designed to precisely position smaller solar tracking equipment. Their robust and efficient DC motor (24V or 36V) keeps power consumption to a minimum. Travel speeds remain nearly constant regardless of the load. Ideal for rugged environments common to the solar industry, these cost-effective SA actuators have an IP65 protection rating. Self-locking features in the mechanism ensure that the solar actuator will hold position throughout the daily tracking cycle. Specifications: • Double clevis mounting for easy installation • Clutch for overload protection • Adjustable limit switches for flexible travel settings • Reed sensor digital feedback for accurate positioning • Duty cycle is 25% (4 min. running, 12 min. rest) • Lubricated for life