Eaton Awarded Department of Energy Grant to Increase Efficiency, Reduce Cost of Electric Vehicle Charging

Project Aimed at Advancing EV Infrastructure

PITTSBURGH … Diversified industrial manufacturer Eaton Corporation has received a $1.84 million grant from the U.S. Department of Energy (DoE) for the development and demonstration of more efficient commercial electric vehicle (EV) chargers. The project will promote smart charging technology that better manages the efficiency, availability and reliability of power, especially during peak times and at popular charging locations.


Eaton's grant is part of a larger federal research and development program to help reduce the current costs of EV chargers by 50 percent over the next three years and to support the adoption and deployment of EVs.

"Smart charging technology will provide more options to consumers and strengthen the charging infrastructure and the electric grid," said John Wirtz, business unit manager, Eaton's Electrical Transportation Infrastructure. "By providing real-time monitoring and reporting, Eaton's participation in this project will help EV fleet managers, businesses and power companies to increase system uptime, reduce energy costs and maximize the reliability of their chargers."

Two of the four selected projects receiving federal funding will focus on improving residential EV chargers. The other two selected projects, including Eaton's, will focus on alternating current (AC) Level 2 charging stations used at commercial and public locations to charge large numbers of vehicles, such as commercial fleets of delivery vehicles.

Eaton is an industry leader in EV infrastructure and hybrid electric vehicle technologies. With a range of charging stations currently deployed in Ontario (Canada), Pennsylvania, California, Washington, Oregon, North Carolina, South Carolina, Indiana and Illinois, Eaton is working to advance the EV charging infrastructure throughout North America, with more than 2,000 charging stations already shipped or installed. Eaton has a wide range of expertise in other markets that use free-standing electrical charging, including truck-stop electrification, ports, marinas, recreational vehicles, government and major public-sector infrastructure. For more information, contact Eaton EVSE support at 855-ETN-EVSE (855-386-3873) or visit www.eaton.com/plugin.

Featured Product

LG Solar Unveils NeON R with Enhanced Aesthetics and Energy Savings

LG Solar Unveils NeON R with Enhanced Aesthetics and Energy Savings

The NeON R module features "Back Contact" cell technology delivering an entirely black panel that is aesthetically pleasing and energy efficient. The cell's seamless, surface blends perfectly into nearly all rooftop designs while the module's electrodes are positioned on the rear of the cell. Using LG's N-type cell structure, the panels produce 365W of energy, up to 7.3kWp, compared to 5.8kWp of the p-type cell. The module's new design minimizes LID, thereby delivering a longer lifespan and increased energy output.