PowerWind Ltd. to supply turbine for Welsh brown field site

This latest contract confirms a leading position for PowerWind in the UK with its integrated portfolio of wind turbine technology and service for onshore markets.

April 10, 2014


PowerWind Ltd. announces its success in securing another new order for a wind turbine to be built in BLAENCILGOED, Wales. The turbine is a joint venture between Infinite Renewables and Albion Community Power Plc who have already invested in a number of wind projects together. This turbine will have a capacity of 500 kilowatts (kW) and a rotor diameter of 56 meters, the machine meets the legal, technical and economic requirements for the feed-in-tariffs. This is the second turbine that PowerWind has supplied to Albion and Infinite following a previous order for a PW500 in 2012.

"We have always been fully convinced of the PW500 performance and are happy that this product has returned to the UK market. Its robustness and high performance is convincing" says William David, director of Infinite Renewables.

Marco Yu, Investment Manager of Albion Ventures, goes on to say: "Our plan is to repeat the success of previous collaborations with Infinite Renewables in the development of another PowerWind turbine in the UK".

This latest contract confirms a leading position for PowerWind in the UK with its integrated portfolio of wind turbine technology and service for onshore markets.

Featured Product

POWER RAIL™ Commercial Mounting System

POWER RAIL™ Commercial Mounting System

The Power Rail™ Commercial Mounting System is designed with the professional PV solar installer in mind. Both the XD/UD and LD/MD rails feature single tool assembly with the revolutionary patented RAD™ Lock-in-Place bolt for fast and secure module clamping. The high strength marine-grade aluminum rails include an integral wiring channel for securing cables and providing a professional finish.