Duke Energy Renewables acquires Seville Solar Projects in Southern California totaling 50 MW

Duke Energy Renewables has six solar power projects in California totaling more than 100 megawatts, enough to power about 23,000 average homes.

CHARLOTTE, N.C., July 28, 2015 /PRNewswire/ -- Duke Energy Renewables today announced it has acquired the 20-megawatt (MW-AC) Seville I and 30-MW Seville II Solar Power Projects in California from Kruger Energy.


The projects are located in Imperial County about 10 miles west of the Salton Sea. With this addition, Duke Energy Renewables has six solar power projects in California totaling more than 100 megawatts, enough to power about 23,000 average homes.

"The Seville projects are a sizeable addition to our California solar portfolio; they will almost double our solar capacity in the state," said Greg Wolf, president, Commercial Portfolio, Duke Energy. "We're pleased to be adding quality projects that will bring economic development to Imperial County and contribute to California's leadership in renewable energy growth."

The energy generated from Seville I and associated renewable energy credits (RECs) will be sold to San Diego Gas & Electric through a 20-year agreement.

Imperial Irrigation District will purchase the power and related RECs from Seville II under a 25-year agreement.

Kruger Energy will oversee the construction of the projects, which is underway. The facilities are expected to be in service by year end.

About Duke Energy Renewables
Duke Energy Renewables, part of Duke Energy's Commercial Portfolio, is a leader in developing innovative wind and solar energy generation projects for customers throughout the United States. The company's growing portfolio of commercial renewable assets includes 16 wind farms and 27 solar farms in operation in 12 states, totaling more than 2 gigawatts in electric-generating capacity. Learn more at www.duke-energy.com/renewables.

Featured Product

GreenFasten™ solar panel roof mount hardware, watertight, USA made

GreenFasten™ solar panel roof mount hardware, watertight, USA made

The GreenFasten™ - GF1 system utilizes the patented watertight technology EcoFasten Solar® is known for. The flashing is fit with our EPDM rubber bushing and when used with a compatible EcoFasten Solar compression bracket (milled with countersink), a watertight seal is created, which protects the integrity of the roof. Requiring just a single fastener (lag bolt or self-drilling), GreenFasten provides the fastest install in the industry and will not void roofing manufacturer's warranties. Backed by IAPMO certification, GreenFasten delivers a mounting solution for all new or existing (retrofit) composition shingle roofs, and is the most cost-effective solution available. Like all of the solar roof mount solutions in our line of products, GreenFasten is made in the USA using recycled materials.