GameChange Steel Purchasing Power and Superior Engineered Designs Drive Utility-Scale Solar Racking Pricing to $.079/watt

Pricing is for dual pile systems under loading conditions typical for inland locations in southern states where large utility scale projects are prevalent.

NEW YORK, NEW YORK - October 5th, 2015 - GameChange Racking announced that the combination of its superior engineered proprietary designs and the massive buying power needed to obtain the ultra-strength steel alloys used by GameChange at superior pricing has allowed for the first time for GameChange to price as low as $.079/watt for its industry quality leading large scale (80MW+) utility scale racking systems. This pricing is for dual pile systems under loading conditions typical for inland locations in southern states where large utility scale projects are prevalent. The same combination of factors has also allowed GameChange to reduce pricing for its mono-post pile driven racking systems to as low as $.089/watt.


Andrew Worden, CEO of GameChange Racking, stated:

"At GameChange we live by our core value: To Change the World by Making Solar Energy Affordable. To do this we strive to lower costs for our valued customers while always maintaining the industrys leading quality and bankability.

Our deep roots in metallurgy, metal fabrication and engineering gives us a unique position to be able to help the industry achieve continually lower racking prices without any sacrifice in structural integrity. Todays pricing breakthrough is a significant additional move in this direction."

Featured Product

SOLTEC – SFOne single axis tracker

SOLTEC - SFOne single axis tracker

SFOne is the 1P single-axis tracker by Soltec. This tracker combines the mechanical simplicity with the extraordinary expertise of Soltec for more than 18 years. Specially designed for larger 72 an 78 cell modules, this tracker is self-powered thanks to its dedicated module, which results into a lower cost-operational power supply. The SFOne has a 5% less piles than standard competitor, what reduces a 75% the labor time.