Giant Wind Turbines

If the U.S. is going to generate 20 percent of its electricity from the wind in the next 20 years, wind turbines will need to evolve in every way - larger, taller, less expensive, more reliable and more efficient. At NREL's National Wind Technology Center, engineers are preparing to install the two largest turbines ever tested at the laboratory. Key elements of a 1.5 MW General Electric turbine have begun arriving; instrumentation and equipment testing should begin by late summer. Installation of a 2.3 MW turbine from Siemens Power Generation is scheduled for late summer, too. Full story here.

Comments (0)

This post does not have any comments. Be the first to leave a comment below.

Post A Comment

You must be logged in before you can post a comment. Login now.

Featured Product

Rolls Battery - Maintenance-Free AGM & GEL Batteries

Rolls Battery - Maintenance-Free AGM & GEL Batteries

With a full range of capacity options (85AH-3300AH) and voltage configurations to choose from, Rolls Battery maintenance-free 2V, 6V & 12V AGM and broad range of 2V GEL models offer a valve regulated lead acid (VRLA) battery option with the same dependable energy storage and heavy-duty construction customers have grown to expect from the Rolls brand for over sixty years. Installed in off-grid, grid-tied or backup float applications, these sealed batteries require minimal ongoing maintenance and provide a versatile energy storage solution for remote or confined installations. Rolls Battery AGM and GEL battery lines deliver superior cycle life and are backed by an industry-leading warranty.