Wind Powered Ski Resort

This $4 million wind turbine project can be found at Jiminy Peak, in Hancock, Massachusetts. The turbine is nicknamed Zephyr, after the Greek god of the west wind. And Zephyr isn't afraid to make its presence known. The tower is more than 250 feet tall. The hub adds 10 feet, and the blades extend an additional 123 feet, creating a 386-foot green machine. Zephyr works its magic to produce about a third of Jiminy Peak's electric needs, shaving $450,000 a year from the resort's energy bill. To put that in perspective, the energy from the turbine is enough to power more than 600 homes. And Zephyr's power doesn't stop there. It has also drawn the interest of many visitors.

Comments (0)

This post does not have any comments. Be the first to leave a comment below.


Post A Comment

You must be logged in before you can post a comment. Login now.

Featured Product

Iron Edison Lithium Iron Battery

Iron Edison Lithium Iron Battery

The Iron Edison Lithium Iron solar battery is fully compatible with popular battery-based inverters and is housed inside a rugged steel enclosure with integrated Battery Management System. Standard capacities range from 2 kWh to 42 kWh, with custom high-capacity and high-voltage models available for commercial applications like peak load shaving and UPS. The battery is designed and assembled at the company's headquarters just outside of Denver, Colorado. The Iron Edison Lithium Iron battery is an ideal replacement for lead-acid battery, with longer cycle life, smaller footprint, and maintenance-free operation. Residential applications include solar battery backup, grid-zero and off-grid energy storage. Commercial applications include high voltage battery backup, off-grid telecommunications power and peak load shaving. If you have any questions, please call us at 720-432-6433. We are happy to help!