America's First Renewable Energy Market Hub

Superconductor Electricity Pipelines have been chosen for The Tres Amigas Project, the nation`s first renewable energy market hub. Superconductor Electricity Pipelines comprise transmission-level direct current (DC) superconductor power cables powered by AMSC high temperature superconductor (HTS) wire and high-powered voltage-source AC/DC power converters. The Tres Amigas Project, which will be announced today in Albuquerque by New Mexico Governor Bill Richardson, focuses on uniting America`s three power grids for the first time to enable faster adoption of renewable energy and increase the reliability of the U.S. grid.

Comments (0)

This post does not have any comments. Be the first to leave a comment below.


Post A Comment

You must be logged in before you can post a comment. Login now.

Featured Product

Parker Wind Power Solutions - Core technologies to help you harness the wind… onshore and offshore

Parker Wind Power Solutions - Core technologies to help you harness the wind… onshore and offshore

Visit Booth #2886 at AWEA Windpower, May 22-25 in Anaheim, CA to see how Parker products, systems and services help you raise performance while reducing risk in wind energy environments. Parker has been on the forefront of windpower for over two decades, with solutions that touch virtually every critical function in the turbine. From integrated lube oil filtration systems and sealing technologies that make drive trains more reliable and bearings operate like new to compact blade pitch actuation systems that maximize rotor efficiency and minimize vibrations in the turbine. Parker has the solutions that make today's advanced and sophisticated wind power plants better and smarter. Case in point? Our high efficiency power conversion systems that deliver optimum power to the grid. While our scalable evaporative cooling system lowers overall system cost with up to 40% higher power throughput.