Coulomb Technologies to install 4,600 electric vehicle charging stations

LA Times - Coulomb Technologies plans to install 4,600 electric vehicle charging stations for free around the country. The installations are part of a $37-million project called ChargePoint America, funded partly by a $15-million stimulus grant administered by the Department of Energy through the Transportation Electrification Initiative. Once the stations are in place, Purdue University and Idaho National Labs will analyze data about vehicle use and charging patterns. The company, based in Campbell, Calif., will immediately start setting up public and private stations in Los Angeles, Sacramento, San Jose and San Francisco Bay Area. The stations will also go up in Austin, Texas; Detroit; New York; Orlando, Fla.; Redmond, Wash.; and Washington, D.C. Once installation launches in the coming weeks, more than 1,000 stations are scheduled to be put in by December, with the rest to be in place by September 2011.

Comments (0)

This post does not have any comments. Be the first to leave a comment below.


Post A Comment

You must be logged in before you can post a comment. Login now.

Featured Product

AllEarth Renewables - The Solar Tracker

AllEarth Renewables - The Solar Tracker

Designed and manufactured in the U.S., the AllEarth Solar Tracker is a complete grid-tied, dual-axis solar electric system that produces up to 45% more electricity than fixed systems. The tracker uses GPS and wireless technology to follow the sun throughout the day for optimal energy production. It has an industry-leading 10 year warranty and 120 mph wind rating, superior snow shedding, and automatic high wind protection. Its simple, durable design and complete system pallet simplifies costly procurement and installation time. Contact us about becoming a dealer partner or purchasing an AllEarth Solar Tracker.