Vestas Jobs Threat Pressures Obama to Extend Tax Break

Vestas Wind Systems A/S's threat to fire 1,600 workers in the U.S. undermines President Barack Obama's goal of creating green jobs and adds to pressure on Congress to extend a tax credit that the industry relies on. The world's biggest maker of wind turbines said yesterday it will probably reduce its staff beyond the 2,335 posts it's eliminating worldwide if the U.S. doesn't renew the so-called Production Tax Credit, which expires at the end of this year. "We will evaluate it during 2012 depending entirely on how the political situation evolves," Chief Executive Officer Ditlev Engel said in an interview in Copenhagen. U.S. jobs will be scrapped "for sure" without the credit, and a decision is due "no later than the fourth quarter," he said.

Comments (0)

This post does not have any comments. Be the first to leave a comment below.

Post A Comment

You must be logged in before you can post a comment. Login now.

Featured Product

AllEarth Renewables - The Solar Tracker

AllEarth Renewables - The Solar Tracker

Designed and manufactured in the U.S., the AllEarth Solar Tracker is a complete grid-tied, dual-axis solar electric system that produces up to 45% more electricity than fixed systems. The tracker uses GPS and wireless technology to follow the sun throughout the day for optimal energy production. It has an industry-leading 10 year warranty and 120 mph wind rating, superior snow shedding, and automatic high wind protection. Its simple, durable design and complete system pallet simplifies costly procurement and installation time. Contact us about becoming a dealer partner.