GE Stalls Solar Factory Construction

Add another solar factory to the list of closures and delays that have been plaguing the industry. Solar startups, including Solyndra and Abound Solar, a recipient of government funds that declared bankruptcy last week, have been failing left and right in the face of low solar panel prices. Now GE has reportedly stopped work on its planned 400-megawatt solar panel factory in Colorado. It says it needs to improve the power output of its technology if it’s to compete.

It was thought that a company like GE, with its deep pockets, might be able to scale up production to the point that its thin-film solar panels could compete with silicon. The reports throw this into doubt. It might be that both low cost and at least comparable efficiency levels are needed to compete.

Comments (0)

This post does not have any comments. Be the first to leave a comment below.


Post A Comment

You must be logged in before you can post a comment. Login now.

Featured Product

WS510 Secondary Standard

WS510 Secondary Standard

In the monitoring of large photovoltaic (Utility Scale), in assessing potential sites (Solar-assessment), or in up and coming electricity cost saving initiatives projects (Commercial & Industrial), the WS510 now provides the market a secondary standard pyranometer, ultrasonic wind speed, ultrasonic wind direction, temperature, pressure and humidity all in a single unit.. This sensor meets the high demands of the world meteorological organization (WMO) through the active valving at air temperature measurement and the inertia- and maintenance-free measurement of wind speed and wind direction on the ultrasonic principle. Equipped with a Kipp & Zonen pyranometer of the secondary standards, the WS510-UMB Compact weather sensor from Lufft unites the precision of a variety of meteorological individual sensors in a single all-in-one device, for the first time.