Recycling firm unveils city's first commercial wind turbine

As the wind whipped off the East River Wednesday morning, Sims Municipal Recycling officially launched the city's tallest and only commercial-scale wind turbine, at its recycling center in Sunset Park, Brooklyn.
 
The 160-foot-tall turbine has the capacity to produce 100 kilowatts, or 4 percent of Sims' power needs. Built by Northern Power Systems, the turbine cost roughly $750,000.
 
Tom Outerbridge, Sims' general manager for recycling, said he hoped the turbine would be the first of many for the city.
 
"On a practical level, it's offsetting our electricity costs," he said during an event to christen the turbine. "For the city, I like to think it's important that it's trying to break new ground and start to carve a path for wind projects to take off."
 
The project took roughly four years to complete, mainly because of permitting. New York State Energy and Research Development kicked in about $130,000 as part of a statewide incentive program.

Comments (0)

This post does not have any comments. Be the first to leave a comment below.


Post A Comment

You must be logged in before you can post a comment. Login now.

Featured Product

LG Solar Unveils NeON R with Enhanced Aesthetics and Energy Savings

LG Solar Unveils NeON R with Enhanced Aesthetics and Energy Savings

The NeON R module features "Back Contact" cell technology delivering an entirely black panel that is aesthetically pleasing and energy efficient. The cell's seamless, surface blends perfectly into nearly all rooftop designs while the module's electrodes are positioned on the rear of the cell. Using LG's N-type cell structure, the panels produce 365W of energy, up to 7.3kWp, compared to 5.8kWp of the p-type cell. The module's new design minimizes LID, thereby delivering a longer lifespan and increased energy output.