UK approves world's biggest offshore wind farm

From Pilita Clark, Environment Correspondent for the Financial Times:  The world’s biggest offshore wind scheme has been given the go-ahead off the coast of Yorkshire, in a move the government said was likely to create hundreds of jobs.
 
The Dogger Bank Creyke Beck project is expected to be one of the UK’s biggest power stations, second only to the Drax coal-fired plant in North Yorkshire and capable of supplying about 2.5 per cent of the country’s electricity.
 
The scheme’s developers have yet to take a final investment decision and the project will almost certainly have to secure backing under the government’s renewable energy subsidy system.
 
But the government’s planning consent for such a large development was welcomed by the industry.
“This is an awesome project,” said Nick Medic, director of offshore renewables at RenewableUK, the wind industry trade body. “It will surely be considered as one of the most significant infrastructure projects ever undertaken by the wind industry.”
 
If built, the scheme will dwarf the London Array in the outer Thames Estuary, currently the largest operating offshore wind farm, with 175 turbines.
 

Comments (0)

This post does not have any comments. Be the first to leave a comment below.


Post A Comment

You must be logged in before you can post a comment. Login now.

Featured Product

Joyce Dayton Corp - Solar Tracking Drive Solutions

Joyce Dayton Corp - Solar Tracking Drive Solutions

Joyce Solar Actuators are designed to precisely position smaller solar tracking equipment. Their robust and efficient DC motor (24V or 36V) keeps power consumption to a minimum. Travel speeds remain nearly constant regardless of the load. Ideal for rugged environments common to the solar industry, these cost-effective SA actuators have an IP65 protection rating. Self-locking features in the mechanism ensure that the solar actuator will hold position throughout the daily tracking cycle. Specifications: • Double clevis mounting for easy installation • Clutch for overload protection • Adjustable limit switches for flexible travel settings • Reed sensor digital feedback for accurate positioning • Duty cycle is 25% (4 min. running, 12 min. rest) • Lubricated for life