Iran is building the Middle East’s first geothermal power plant

Iran is building the Middle East’s first geothermal power plant at the foot of an inactive volcanic peak as the country is racing to meet a runaway demand for electricity by its growing population. 

The pilot station in northwestern Meshguin Shahr in the Ardabil province is projected to come on stream in the next two years, putting Iran in the club of two dozen nations with the geothermal power generation capacity.

The 50-megawatt project is in line with Iran’s bid to expand its clean energy mix which is dominated by fossil fuels. Geothermal power is cheaper and more reliable than other renewable energy sources, such as thermal or hydro power.  Cont'd...

Comments (0)

This post does not have any comments. Be the first to leave a comment below.

Post A Comment

You must be logged in before you can post a comment. Login now.

Featured Product

WS510 Secondary Standard

WS510 Secondary Standard

In the monitoring of large photovoltaic (Utility Scale), in assessing potential sites (Solar-assessment), or in up and coming electricity cost saving initiatives projects (Commercial & Industrial), the WS510 now provides the market a secondary standard pyranometer, ultrasonic wind speed, ultrasonic wind direction, temperature, pressure and humidity all in a single unit.. This sensor meets the high demands of the world meteorological organization (WMO) through the active valving at air temperature measurement and the inertia- and maintenance-free measurement of wind speed and wind direction on the ultrasonic principle. Equipped with a Kipp & Zonen pyranometer of the secondary standards, the WS510-UMB Compact weather sensor from Lufft unites the precision of a variety of meteorological individual sensors in a single all-in-one device, for the first time.