Iran is building the Middle East's first geothermal power plant

Iran is building the Middle East’s first geothermal power plant at the foot of an inactive volcanic peak as the country is racing to meet a runaway demand for electricity by its growing population. 

The pilot station in northwestern Meshguin Shahr in the Ardabil province is projected to come on stream in the next two years, putting Iran in the club of two dozen nations with the geothermal power generation capacity.

The 50-megawatt project is in line with Iran’s bid to expand its clean energy mix which is dominated by fossil fuels. Geothermal power is cheaper and more reliable than other renewable energy sources, such as thermal or hydro power.  Cont'd...

Comments (0)

This post does not have any comments. Be the first to leave a comment below.


Post A Comment

You must be logged in before you can post a comment. Login now.

Featured Product

Southco Inc.  - POWER UP YOUR CHARGING DESIGN

Southco Inc. - POWER UP YOUR CHARGING DESIGN

With engineered access solutions for electric vehicle charging equipment. Southco's engineered access hardware, including locks, latches and hinges can help Electric Vehicle (EV) charging manufactures to achieve high standards of equipment performance, usability and security, providing a seamless charging experience for drivers.