Construction of the largest land-based wind turbine ever built in the United States.

“Reaching New Heights” uses a combination of time-lapse footage, aerial photography and behind-the-scenes action shots to document the steps involved in building MidAmerican Energy’s first concrete wind turbine tower, located at the company’s Adams wind farm in Adams County, Iowa. At 379 feet from ground to hub, the concrete turbine is more than 100 feet taller than its neighboring turbines constructed with steel towers.

Comments (0)

This post does not have any comments. Be the first to leave a comment below.


Post A Comment

You must be logged in before you can post a comment. Login now.

Featured Product

EVERVOLT home battery storage: Standby power with or without solar

EVERVOLT home battery storage: Standby power with or without solar

Renewable energy stored in an EVERVOLT home battery system is the perfect backup plan against an uncertain utility grid and weather events. Run key appliances longer and live life when the unexpected happens. EVERVOLT battery storage systems are covered by a complete 12-year warranty from Panasonic.