First annual conference to feature 50 top Green IT technology companies

Green IT Economic Summit 2010 showcases the benefits of breakthroughs in Green hardware and software technology and empowers businesses to use resources more efficiently, delivering greater profits and sustainability.

Join the 2010 Green IT Economic Summit in Tysons Corner, Virginia on April 22, 2010. The first annual Green IT Economic Summit will feature approximately 50 of the world's top technology firms, dozens of high profile speakers and exclusive panels geared toward a national audience of CXOs, private equity investors, and executive entrepreneurs.



The Green IT Economic Summit has featured over 25 of the most dynamic technology and business speakers including names like Christopher Mines, Sr. Vice President, Forrester Research and Raj Kosuri, CEO and CTO of EcomNets to name a few. Green IT Economic Summit speakers are thought leaders who inform, educate and inspire the leaders of the new economy.

We are very excited for the Green IT Economic Summit event that will feature over 25 leading experts and discuss the leading Green IT technologies in 6 sessions:

Mapping the Green IT Economics: Keynote Address by Chris Mines
Enterprise Carbon and Energy Management Systems
Data center application rationalization.
Cloud Computing and Green IT Economic Impact
Infrastructure Virtualization
Green stimulus spending
Get Ready for Green IT 2.0

The Green IT Economic Summit strives to support entrepreneurial activity, innovation and the resultant Green IT economic development of the North America.

Featured Product

POWER MAX™ Ballasted Roof Mounting System

POWER MAX™ Ballasted Roof Mounting System

Preformed Line Products introduces the POWER MAX Ballasted Roof Mounting System. The POWER MAX solar mounting system is engineered to maximize energy output on commercial flat roofs. Developed with the professional installer in mind, this system offers adjustable inter-row spacing in the field of up to 11 inches. It features 50% fewer components and a simplified design resulting in faster assembly rates and labor savings on every project. Available in a flush mount, 5˚ or 10˚ tilt or higher density dual tilt design, the POWER MAX base arrives stacked on pallets providing easier transport to the roof. Engineered as a fully ballasted, non-penetrating system, it accepts standard concrete blocks and is qualified by wind tunnel testing.