TÜV SÜD at EWEA 2014:

At EWEA 2014 in Barcelona, TÜV SÜD will showcase the result of an important research project about the potential of high wind power resources in forested areas together with its full scope of wind energy products and services (Booth 7B100).

The findings of the extensive research project underline a significant European market shift, that demonstrates a need for improved forecasts and standardised measurements within previously under utilised wind power locations.


"A number of early-stage projects have appeared within forest areas in some European countries and their success has encouraged others to follow suit", said Peter-Herbert Meier, head of the Wind Cert Services Unit of TÜV SÜD Industrie Service GmbH. "However, since modelling data associated with these notoriously difficult to reach sites is often limited, there is a growing demand for investors and operators for more robust, qualitative and quantitative research."

As part of the two-year research programme, initiated in partnership with Natural Energy Solutions (NES), in October 2012, TÜV SÜD erected a 140-metre research mast to measure wind conditions in a mountainous German forest. Although simulations and forecasts had previously provided information and data to assist in the search for a profitable wind farm size, the construction of the mast delivered standardised measurements and strengthened exisiting topographical understanding, to better shape and define 2D and 3D models. "We are positively surprised by our evaluation of the data delivered form the measurements so far", said Meier. Wind speed proved to be stronger than had predicted from preliminary simulations and data.

"As the forestry research initiative demonstrates, a topographically complex geography is no longer a significant barrier to future commercial growth", added Alan Chivers, Chairman, TÜV SÜD PMSS.

Since the acquisition of PMSS by TÜV SÜD in 2012, the division has significantly extended its service portfolio for renewable energy technologies. The global team of PMSS works directly with clients in areas including development strategy, due diligence, environment and permitting, safety and risk management and engineering and construction. Increasingly, the work of PMSS requires providing consultancy and advice for developers working in hostile environments and climates.

For over twenty years TÜV SÜD PMSS has delivered offshore wind projects across Europe, Asia-Pacific and North America working for governments, project developers, OEMs, utilities, banks, institutional investors, insurers and other stakeholders.

Featured Product

RBI Solar - Dahlia Has You Covered

RBI Solar - Dahlia Has You Covered

What if you could maximize the Ground Coverage Ratio (GCR) on your next project and not have to worry about the complicated variables that come with a tracker system? With a low tilt and clearance design, Dahlia® has the highest GCR of any fixed-tilt system in the marketplace. The system is available in three tilt options (7.5, 10 and 12.5 degrees) and designed to accommodate any sized PV module. The lightweight system is engineered with fewer components, several of which are shipped to job sites pre-assembled. This design feature reduces freight costs and rapidly trims the amount of on-site installation time required to complete construction. Maximizing PV coverage on a site can lead to an increase of production, which creates greater financial return for project owners. Over 100 MW of Dahlia® projects have been deployed across the United States, in regions of variable snow and wind loads. How much can Dahlia® cover and save you on your next project?