E.ON presents Natural Power with ‘Comprehensive Provision of Project Management' award

Natural Power also provided key construction project management and design advisory services to E.ON including Owner's Engineer role.

Natural Power joins E.ON at the official opening of their 50 MW Camster Wind Farm after providing key services on the site.


At the opening E.ON recognised the hard work of Natural Power's Project Manager Kerr Willis with the presentation of a ‘Comprehensive Provision of Project Management' award.

The international renewable energy consultancy has provided E.ON with a suite of services on this 25 turbine site located between Lybster and Watten in Caithness, Scotland. The company has worked on the site for over 10 years, most notably providing community liaison, Ecology & Hydrology services including extensive consultation with Scottish Natural Heritage leading to the successful consent of the project.

Natural Power also provided key construction project management and design advisory services to E.ON including Owner's Engineer role. Acting in this role during both the pre- construction and construction phases of the project has allowed Natural Power to provide significant world leading services to E.ON, including:

*Pre-construction planning services;
*Tendering and contracting services Civil & Electrical (BoP), turbine supplier, forestry contractor;
*Full construction management services for construction phase including monitoring progress, quality and managing the interface with all contractors;
*Resident Engineer services;
*CMD-Coordinator;
*Ecological Clerk of Works and hydrological monitoring;
*Geotechnical site investigations;
*Turbine inspections

Kerr commented: "As a company we are delighted to continue to work with E.ON on another of their projects. Natural Power has extensive experience across the full lifecycle of a renewable energy project. Camster Wind Farm has allowed our renewable energy experts to use our industry leading knowledge during the planning, pre-construction and construction phases of the 50 MW wind farm. We look forward to working with E.ON in the near future."

For more information sayhello@naturalpower.com or visit www.naturalpower.com

Contact details:
Sarah Brady
Events & PR Officer
Natural Power
sayhello@naturalpower.com

Featured Product

​Stäubli Electrical Connectors

​Stäubli Electrical Connectors

​Stäubli Electrical Connectors are used on more than 300 GW, over 50% of the PV capacity worldwide. The MC4 family of UL and TUV listed products include connectors, in-line fuses, branch connectors, cable assembly and more.