E.ON presents Natural Power with ‘Comprehensive Provision of Project Management' award
Natural Power also provided key construction project management and design advisory services to E.ON including Owner's Engineer role.
Natural Power joins E.ON at the official opening of their 50 MW Camster Wind Farm after providing key services on the site.
At the opening E.ON recognised the hard work of Natural Power's Project Manager Kerr Willis with the presentation of a ‘Comprehensive Provision of Project Management' award.
The international renewable energy consultancy has provided E.ON with a suite of services on this 25 turbine site located between Lybster and Watten in Caithness, Scotland. The company has worked on the site for over 10 years, most notably providing community liaison, Ecology & Hydrology services including extensive consultation with Scottish Natural Heritage leading to the successful consent of the project.
Natural Power also provided key construction project management and design advisory services to E.ON including Owner's Engineer role. Acting in this role during both the pre- construction and construction phases of the project has allowed Natural Power to provide significant world leading services to E.ON, including:
*Pre-construction planning services;
*Tendering and contracting services Civil & Electrical (BoP), turbine supplier, forestry contractor;
*Full construction management services for construction phase including monitoring progress, quality and managing the interface with all contractors;
*Resident Engineer services;
*CMD-Coordinator;
*Ecological Clerk of Works and hydrological monitoring;
*Geotechnical site investigations;
*Turbine inspections
Kerr commented: "As a company we are delighted to continue to work with E.ON on another of their projects. Natural Power has extensive experience across the full lifecycle of a renewable energy project. Camster Wind Farm has allowed our renewable energy experts to use our industry leading knowledge during the planning, pre-construction and construction phases of the 50 MW wind farm. We look forward to working with E.ON in the near future."
For more information sayhello@naturalpower.com or visit www.naturalpower.com
Contact details:
Sarah Brady
Events & PR Officer
Natural Power
sayhello@naturalpower.com
Featured Product

HPS EnduraCoilTM Cast Resin Medium Voltage Transformer
HPS EnduraCoil is a high-performance cast resin transformer designed for many demanding and diverse applications while minimizing both installation and maintenance costs. Coils are formed with mineral-filled epoxy, reinforced with fiberglass and cast to provide complete void-free resin impregnation throughout the entire insulation system. HPS EnduraCoil complies with the new NRCan 2019 and DOE 2016 efficiency regulations and is approved by both UL and CSA standards. It is also seismic qualified per IBC 2012/ASCE 7-10/CBC 2013. Cast resin transformers are self-extinguishing in the unlikely event of fire, environmentally friendly and offer greater resistance to short circuits. HPS also offers wide range of accessories for transformer protection and monitoring requirements.