Amber Kinetics Announces Game Changing Energy Storage Contract With PG&E

Amber Kinetics, Inc. announces signing a landmark, multi-year Energy Services Agreement (ESA) with Pacific Gas and Electric Company (PG&E) for 20 megawatts of storage using its game changing, four-hour duration Gen-2 Flywheel Systems©. The company believes its steel flywheel technology will drive down pricing while enhancing operational safety and flexibility for utility-scale energy storage.

UNION CITY, Calif.--(BUSINESS WIRE)--Amber Kinetics, Inc. announces signing a landmark, multi-year Energy Services Agreement (ESA) with Pacific Gas and Electric Company (PG&E) for 20 megawatts of storage using its game changing, four-hour duration Gen-2 Flywheel Systems©. The company believes its steel flywheel technology will drive down pricing while enhancing operational safety and flexibility for utility-scale energy storage.


Amber Kinetics Gen-2 Flywheel Systems© are the first four-hour discharge duration flywheels. Until now, commercial flywheel system capabilities were measured in minutes, with limited usefulness to electric utilities seeking to integrate renewable energy at transmission and micro-grid levels.

Amber Kinetics technology offers critical advantages over batteries. Even with unlimited cycling during their 30-year lifespan, the systems have no degradation. Because they are 98% steel by weight, they pose no risk of fire, chemical explosion or hazardous materials release. Most important, because they are manufactured from readily available, abundant raw materials and dont need replacement at regular intervals, they are significantly more cost effective than batteries.

Energy Nuevo, Amber Kinetics 20 MW project located in the city of Fresno, was selected by PG&E in Californias first energy storage solicitation. It is believed to be one of the largest ever for a transmission level flywheel system. Energy Nuevo will provide energy storage under a 20-year ESA, beginning in 2020.

"Our flywheel systems are designed to be safe, sustainable and highly reliable," said Ed Chiao, chief executive, Amber Kinetics. "Our vision is to provide cost effective, flexible capacity for utilities looking to use storage to reduce costs and integrate renewable resources."

The company is in negotiations for up to 30 MW of energy storage systems with a Pacific Rim independent power producer, and in discussion for several pilot microgrid programs at U.S. military installations.

Amber Kinetics corporate offices and pilot manufacturing facility are located in Union City, CA, near San Francisco. The company is vertically integrated, manufacturing its technology and developing energy storage projects using its flywheel system -- a common model in the PV solar industry.

The companys core development team is comprised of veterans of the utility-scale PV solar boom, including those who received one of the first contracts under Californias Renewables Portfolio Standard. It became the first transmission level PV facility to connect to the California grid. The company has recruited deep manufacturing expertise.

For information, visit amberkinetics.com or call Bill Barnes at (510) 474-1000 x707.

Featured Product

OMCO Origin® Factory-Direct Trackers

OMCO Origin® Factory-Direct Trackers

A One-In-Portrait (1P) solution that support a wide range of solar projects (utility scale, distributed generation (DG), & C&I markets). Manufactured and factory preassembled in the USA at one of OMCO Solar's 5 US plants (AZ, IN, AL, OH), OMCO makes all structural components with domestic steel and now can offer a 100% domestic tracker. OMCO Origin® Factory-Direct Trackers include universal module mounts with options for all commercially available modules, labor-saving bearings with 6 adjustable ways to compensate for posts and terrain issues, and foundation solutions for every terrain including OMCO C Piles.