49 Megawatt Solar Farm

Ecosystem Solar Electric Corp. applying for permits to build a 49 MWe Super Peaker. The Super Peaker, a Solar Thermal Electric CSP and Recovered Free Energy Technology, Integrated Storage Component Hybrid Power Plant is to be sited near Boron, a small town located in the vastness of the Southern California Mojave Desert. It will operate 24/7/365 and is estimated to produce over 290,000 megawatt-hours, sufficient to power 45,000 homes and businesses. Construction cost is estimated at $49 million, which is lower than that of a coal-fired power plant. [read more]

Comments (0)

This post does not have any comments. Be the first to leave a comment below.


Post A Comment

You must be logged in before you can post a comment. Login now.

Featured Product

POWER RAIL™ Commercial Mounting System

POWER RAIL™ Commercial Mounting System

The Power Rail™ Commercial Mounting System is designed with the professional PV solar installer in mind. Both the XD/UD and LD/MD rails feature single tool assembly with the revolutionary patented RAD™ Lock-in-Place bolt for fast and secure module clamping. The high strength marine-grade aluminum rails include an integral wiring channel for securing cables and providing a professional finish.