Aquion Energy Selects Pennsylvania for First Large-Scale Manufacturing Facility

Aquion Energy Inc., a developer and manufacturer of revolutionary sodium ion batteries and energy storage systems, today announced it has chosen Westmoreland County, Pennsylvania as the site for its first full-scale manufacturing facility.

"After considering all of our options, including aggressive offers from a number of other U.S. states, we concluded that southwestern Pennsylvania is the best location for Aquion to establish its first high-volume manufacturing operation"

Starting in 2012, Aquion will be leasing space within a large existing facility in East Huntingdon Township from the Regional Industrial Development Corporation of Southwestern Pennsylvania (RIDC). The build-out of the base facility and factory infrastructure will begin immediately and continue throughout 2012. Initial product manufacturing is scheduled to commence in 2013. As part of a first phase manufacturing commitment at this site, Aquion expects to create over 400 high-tech manufacturing jobs by the end of 2015.

Click here for full Press Release
 

Comments (0)

This post does not have any comments. Be the first to leave a comment below.


Post A Comment

You must be logged in before you can post a comment. Login now.

Featured Product

QuickBOLT - Low Profile QuickBOLT

QuickBOLT - Low Profile QuickBOLT

QuickBOLT Low Profile QuickBOLT with Microflashing™ is the industry's affordable, UL Certified Asphalt Shingle mounting system. The Microflashing™ is compressed by the collar on the bolt to create a water-tight seal. With an installation time of less than one minute, the Low Profile QuickBOLT allows installers to complete more jobs.