Recycling firm unveils city's first commercial wind turbine

As the wind whipped off the East River Wednesday morning, Sims Municipal Recycling officially launched the city's tallest and only commercial-scale wind turbine, at its recycling center in Sunset Park, Brooklyn.
 
The 160-foot-tall turbine has the capacity to produce 100 kilowatts, or 4 percent of Sims' power needs. Built by Northern Power Systems, the turbine cost roughly $750,000.
 
Tom Outerbridge, Sims' general manager for recycling, said he hoped the turbine would be the first of many for the city.
 
"On a practical level, it's offsetting our electricity costs," he said during an event to christen the turbine. "For the city, I like to think it's important that it's trying to break new ground and start to carve a path for wind projects to take off."
 
The project took roughly four years to complete, mainly because of permitting. New York State Energy and Research Development kicked in about $130,000 as part of a statewide incentive program.

Comments (0)

This post does not have any comments. Be the first to leave a comment below.


Post A Comment

You must be logged in before you can post a comment. Login now.

Featured Product

POWER RAIL™ Commercial Mounting System

POWER RAIL™ Commercial Mounting System

The Power Rail™ Commercial Mounting System is designed with the professional PV solar installer in mind. Both the XD/UD and LD/MD rails feature single tool assembly with the revolutionary patented RAD™ Lock-in-Place bolt for fast and secure module clamping. The high strength marine-grade aluminum rails include an integral wiring channel for securing cables and providing a professional finish.