Recycling firm unveils city's first commercial wind turbine

As the wind whipped off the East River Wednesday morning, Sims Municipal Recycling officially launched the city's tallest and only commercial-scale wind turbine, at its recycling center in Sunset Park, Brooklyn.
 
The 160-foot-tall turbine has the capacity to produce 100 kilowatts, or 4 percent of Sims' power needs. Built by Northern Power Systems, the turbine cost roughly $750,000.
 
Tom Outerbridge, Sims' general manager for recycling, said he hoped the turbine would be the first of many for the city.
 
"On a practical level, it's offsetting our electricity costs," he said during an event to christen the turbine. "For the city, I like to think it's important that it's trying to break new ground and start to carve a path for wind projects to take off."
 
The project took roughly four years to complete, mainly because of permitting. New York State Energy and Research Development kicked in about $130,000 as part of a statewide incentive program.

Comments (0)

This post does not have any comments. Be the first to leave a comment below.


Post A Comment

You must be logged in before you can post a comment. Login now.

Featured Product

Tile Replacement Mount from Quick Mount PV

Tile Replacement Mount from Quick Mount PV

The Tile Replacement Mount provides a fast and easy way to install solar on tile roofs while protecting against water intrusion. Simply remove the tile and replace it with the Tile Replacement Mount. Works with all standard curved and flat tile roofs, and all standard rail-based racking systems. Flashed at both the deck and top levels, the mount is fully engineered to meet code requirements and industry best practices. The Tile Replacement Mount features Quick Mount PV's patented Elevated Water Seal technology for optimal waterproofing. Get a free sample and see for yourself!