Construction of the largest land-based wind turbine ever built in the United States.

“Reaching New Heights” uses a combination of time-lapse footage, aerial photography and behind-the-scenes action shots to document the steps involved in building MidAmerican Energy’s first concrete wind turbine tower, located at the company’s Adams wind farm in Adams County, Iowa. At 379 feet from ground to hub, the concrete turbine is more than 100 feet taller than its neighboring turbines constructed with steel towers.

Comments (0)

This post does not have any comments. Be the first to leave a comment below.


Post A Comment

You must be logged in before you can post a comment. Login now.

Featured Product

SolarEdge Technologies - EV Charging Single Phase Inverter

SolarEdge Technologies - EV Charging Single Phase Inverter

The SolarEdge PV inverter combines sophisticated digital control technology with efficient power SolarEdge's EV charging single phase inverter offers homeowners the ability to charge electric vehicles up to six times faster than a standard Level 1 charger through an innovative solar boost mode that utilizes grid and PV charging simultaneously. This product is the world's first EV charger with an integrated PV inverter. Reducing the hassle of installing separately a standalone EV charger and a PV inverter, the EV charging inverter eliminates the need for additional wiring, conduit and a breaker installation. By installing an EV charger that is integrated with an inverter, no additional dedicated circuit breaker is needed, saving space and ruling out a potential upgrade to the main distribution panel. Whether you own an EV now or just want to be EV-ready, future-proof your home with SolarEdge.