Yaskawa - Solectria Solar Inverters Chosen for IKEA Las Vegas

Yaskawa - Solectria Solar, a leading U.S. PV inverter manufacturer, announced today that its SGI 500XTM three-phase, central inverters have been chosen by Helix Electric for IKEA in Las Vegas, Nevada. This installation will be Nevada's largest retail solar array and will be commissioned in spring 2016 before the official store opening in summer 2016.

First Global Green Bank Network Will Speed Shift to Clean Energy

New partnership and funding will combine power of green banks to mobilize private investment in renewable energy and energy efficiency

Ormat to Acquire Geothermal Power Plant in the Island of Guadeloupe

Adds 14.75 MW, With Potential Expansion to Up to 45 MW of Capacity Transaction to be Immediately Accretive to Ormat's EPS

Paris 'Action Day' Announcement

Pacific Gas and Electric Company (PG&E) announced today that all of its operations service centers-nearly 100 facilities in Northern and Central California-will be 100 percent powered by solar energy through the utility's Solar Choice program.

Azure Power Signs 150 MW Project in Punjab

With this win Azure Power becomes the largest owner and operator of Solar Power Plants in Punjab

Saft marine Li-ion batteries will provide effective energy storage for ABB's new diesel-electric hybrid cable-laying vessel

ABB cable-laying vessel will be first in world to be fitted with Saft's new generation liquid cooled high power Li-ion battery system ---- Saft energy storage system will backup cable outloading operations in port and provide propulsion assistance at sea

SunPower Starts Construction on 100-Megawatt Boulder Solar Plant for NV Energy

15-Megawatt Solar Plant at Nellis Air Force Base Now Generating Power to Serve Base Operations

Duke Energy Renewables blows into Oklahoma with 200-megawatt wind project

- Company will sell power to City Utilities of Springfield - Project pushes Duke Energy Renewables past 2,000 megawatts of wind power in U.S.

Eco Wave Power Receives EU Funding Approval for Wave Energy Power Plant in Gibraltar

An Announcement made by EWP earlier today confirms a European Union grant for Eco Wave Power's wave energy Project in Gibraltar.

Ballard Appoints Marty Neese to Board of Directors

Ballard Power Systems today announced that, effective December 4, 2015 the Company has appointed Mr. Marty T. Neese to the Board of Directors.

Soltage and Tenaska Announce Portfolio Investment in Solar Generation Assets

Transaction Marks Tenaska's First Portfolio Investment Following Corporate Investment

Global Small Wind Turbines Installed Capacity Will Surge to 4.8 Gigawatts by 2025, says GlobalData

Global cumulative installed capacity of small wind turbines will increase more than fivefold from 912.6 Megawatts in 2014 to 4.8 Gigawatts by 2025---- However, market challenges include the economic crisis, zoning and permitting issues, low public awareness, lack of a federal net-metering program, and certification issues, says analyst

WattPlan Revealing Savings of Electric Vehicles and Solar in California, New York, Arizona

Online software has already provided 10,000 residential customers with instant, personalized estimates to determine optimal energy solutions, electric rates

Get the Latest on the Biofuels Industry Transformation at Infocast's Bio-Based & Renewable Fuels Forum January 12 in San Diego

Hear New Opportunities in the Biofuels / Bio-Based Materials Nexus

Minneapolis-St. Paul International Airport Powers Up Minnesota's Largest Solar Energy Project

First Airport in the Nation to Construct a Solar Generation Structure of this Kind

Records 1891 to 1905 of 19180

First | Previous | Next | Last

Featured Product

IMO Precision Controls - Keeping Solar Safe

IMO Precision Controls - Keeping Solar Safe

The IMO FireRaptor provides three forms of Solar Panel Rapid Shutdown to ZERO VOLTS in case of fire or other emergency: Manual Panel Shutdown to 0V Operated from Ground Level, Automatic Panel Shutdown to 0V at >85°C (185°F) Temperature, and an automatic Panel Shutdown to 0V on External Power Loss. The FireRaptor can be installed without any set-up and with any string inverter as its functionality is completely independent. "Plug & Play" style installation using industry standard connectors is easy, whether fitted to new installs or retrofitted to existing projects to upgrade fire safety functionality. Meeting NEC2017's regulation to switch DC current at the PV panel in under 30 seconds, FireRaptor is remains one of the safest and most effective means of isolating DC current at the source, and the only rapid shutdown with a 20 year warranty.