Largest Solar Rooftop Project in U.S. to be Built in Salt Lake City

Salt Lake County and its project partners, NexGen Energy and Bella Energy, announced the construction in downtown Salt Lake City of one of the largest roof-top solar panel installations in the United States. The estimated 600,000 square-foot system will be built atop the Calvin L. Rampton – Salt Palace Convention Center. When completed, the system will produce 2.6 megawatts of electricity, one-quarter of the annual needs of the convention center. The team presented a plan to install up to 2.6 megawatts of solar modules on the structure. If built to that capacity, the Salt Palace will host the largest rooftop solar facility in the United States, generating more than 3,330,000 kilowatt hours of electricity every year while reducing the building’s consumption by 25%.

Comments (0)

This post does not have any comments. Be the first to leave a comment below.


Post A Comment

You must be logged in before you can post a comment. Login now.

Featured Product

GreenFasten™ solar panel roof mount hardware, watertight, USA made

GreenFasten™ solar panel roof mount hardware, watertight, USA made

The GreenFasten™ - GF1 system utilizes the patented watertight technology EcoFasten Solar® is known for. The flashing is fit with our EPDM rubber bushing and when used with a compatible EcoFasten Solar compression bracket (milled with countersink), a watertight seal is created, which protects the integrity of the roof. Requiring just a single fastener (lag bolt or self-drilling), GreenFasten provides the fastest install in the industry and will not void roofing manufacturer's warranties. Backed by IAPMO certification, GreenFasten delivers a mounting solution for all new or existing (retrofit) composition shingle roofs, and is the most cost-effective solution available. Like all of the solar roof mount solutions in our line of products, GreenFasten is made in the USA using recycled materials.