America's First Renewable Energy Market Hub

Superconductor Electricity Pipelines have been chosen for The Tres Amigas Project, the nation`s first renewable energy market hub. Superconductor Electricity Pipelines comprise transmission-level direct current (DC) superconductor power cables powered by AMSC high temperature superconductor (HTS) wire and high-powered voltage-source AC/DC power converters. The Tres Amigas Project, which will be announced today in Albuquerque by New Mexico Governor Bill Richardson, focuses on uniting America`s three power grids for the first time to enable faster adoption of renewable energy and increase the reliability of the U.S. grid.

Comments (0)

This post does not have any comments. Be the first to leave a comment below.


Post A Comment

You must be logged in before you can post a comment. Login now.

Featured Product

Terrasmart - Reduce Risk and Accelerate Solar Installations

Terrasmart - Reduce Risk and Accelerate Solar Installations

We push the limits in renewable energy, focusing on innovation to drive progress. Pioneering new solutions and ground-breaking technology, and smarter ways of working to make progress for our clients and the industry.