America's First Renewable Energy Transmission Hub

Tres Amigas, LLC today announced that it has submitted filings with the Federal Energy Regulatory Commission (FERC) requesting regulatory approvals needed to move forward with the Tres Amigas SuperStation, America's first renewable energy transmission hub. The SuperStation will be located in Clovis, New Mexico and will for the first time provide the capability to transfer thousands of megawatts of power between the three U.S. power grids - or "Interconnections" - known as the Eastern Interconnection, the Western Interconnection and the Texas Interconnection. By enabling the exchange of wind, solar and geothermal power between all three grids, the Tres Amigas SuperStation will help break our nation's transmission bottleneck.

Comments (0)

This post does not have any comments. Be the first to leave a comment below.


Post A Comment

You must be logged in before you can post a comment. Login now.

Featured Product

FLIR PV KIT - Solar Troubleshooting Kit for Photovoltaic Systems

FLIR PV KIT - Solar Troubleshooting Kit for Photovoltaic Systems

FLIR PV kits are designed to assess the performance, safety, and efficiency of residential, commercial, and industrial solar panels and photovoltaic systems. PV kits from FLIR help you diagnose faults and potential failures and ensure optimal energy production, system longevity, and compliance with industry standards. With a PV kit from FLIR, you'll be perfectly equipped for any solar installation or repair.