Army Kicks Off $7 Billion Alternative Energy Project

The Army issued a draft request for proposals today to purchase over a 30-year period $7 billion worth of power generated from alternative energy sources, including solar, wind, geothermal and biomass.

Katherine Hammock, assistant secretary of the Army for installations, energy and environment, announced plans for the project last year to support the service's goal of having installations produce more energy than they consume.

The Army Corps of Engineers' Engineering and Support Center in Huntsville, Ala., which is managing the procurement, said the alternative energy power generation plants will be located on or near federal property.

Hammond said last year that the Army would support their development by leasing land on installations, and the draft RFP backs this up with language that says the service endorses "the procurement of large scale renewable energy generated on or near Army land."

Comments (0)

This post does not have any comments. Be the first to leave a comment below.


Post A Comment

You must be logged in before you can post a comment. Login now.

Featured Product

OMCO OriginĀ® Factory-Direct Trackers

OMCO Origin® Factory-Direct Trackers

A One-In-Portrait (1P) solution that support a wide range of solar projects (utility scale, distributed generation (DG), & C&I markets). Manufactured and factory preassembled in the USA at one of OMCO Solar's 5 US plants (AZ, IN, AL, OH), OMCO makes all structural components with domestic steel and now can offer a 100% domestic tracker. OMCO Origin® Factory-Direct Trackers include universal module mounts with options for all commercially available modules, labor-saving bearings with 6 adjustable ways to compensate for posts and terrain issues, and foundation solutions for every terrain including OMCO C Piles.