Schletter Invests $27 Million In Solar Power Manufacturing Plant, Creating 305 North Carolina Jobs

A manufacturer of solar power mounting systems, Schletter, Inc., will invest $27 million to establish a production and distribution facility in Shelby, North Carolina, with plans to create 305 jobs by the end of 2016.

The new facility in Shelby, which will serve as the production and distribution hub of Schletter’s east coast operations, will house all functions required to produce the company’s eight types of solar mounting systems. In addition to the manufacturing operations, the Shelby location will become Schletter’s U.S. headquarters.


We’re excited to offer our customers improved delivery and service options by opening our second U.S. manufacturing facility and new U.S. corporate headquarters in Shelby, North Carolina,” stated Martin Hausner, President of Schletter Inc.

“The decision to locate a manufacturing facility in North Carolina was primarily based on providing improved services for our East Coast customers; faster delivery of our products, and reduced logistics costs,” Ludwig Schletter, owner of the Schletter Corporation said. “We will never lose sight of our goals which include remaining a competitive force in the market while providing the highest quality product.”

Comments (0)

This post does not have any comments. Be the first to leave a comment below.


Post A Comment

You must be logged in before you can post a comment. Login now.

Featured Product

Quality assurance in the manufacturing industry

Quality assurance in the manufacturing industry

Efficiency and precision with CSP software. In the highly competitive world of manufacturing, quality assurance is a critical factor for success. CSP offers you state-of-the-art software solutions specifically designed to ensure the highest standards of quality assurance in the manufacturing industry.