Brazil Expects $235 Billion in Renewable Energy During Decade

Brazil will see $235 billion of investments in renewable-energy and biofuel projects during the next ten years, Edison Lobao, the country’s mines and energy minister, said today at a United Nations event on sustainable energy in New York.

The nation will install 36 gigawatts of hydroeletric plants, 12 gigawatts of biomass plants and 11 gigawatts of wind farms during that time, according to a transcript of the minister’s speech acquired by Bloomberg News.

Comments (0)

This post does not have any comments. Be the first to leave a comment below.


Post A Comment

You must be logged in before you can post a comment. Login now.

Featured Product

Parker KleenVent provides closed-loop solution for wind turbine cooling systems

Parker KleenVent provides closed-loop solution for wind turbine cooling systems

Many 1.5 MW wind turbines use traditional open-loop water/glycol cooling systems. Regular water evaporation in the reservoir elevates the mixture's viscosity, prohibiting cooling of the IGBT and associated critical controls, causing the wind turbine to overheat unless serviced, which in turn means turbine downtime and high maintenance costs. Parker's KleenVent Coolant Evaporation Inhibitor (KV-CEI) is a simple add-on to the legacy cooling system, that eliminates water evaporation in the coolant solution and stops the ingress of airborne contaminants, by enclosing the cooling loop. The KVCEI also removes the need for continuous coolant monitoring during the warm season. Traditional maintenance calls to replenish or rebalance the fluids, take the wind turbine and transformer offline, resulting in significant downtime and revenue loss. Parker's cooling system solution optimizes wind turbine uptime and revenue, reduces maintenance costs and increases overall efficiencies.