Governors call for PTC extension

Governors from states with wind farms and manufacturing plants to serve the industry called on Congressional leaders for an immediate extension of the federal production tax credit (PTC) that is set to expire at year’s end.

The Governors’ Wind Coalition (GWC) is seeking at least a one-year extension of the PTC. Wind farms must be put into service by Dec. 31 to qualify for the 10-year subsidy.

In a letter to Congressional leadership today, Iowa Governor Terry Branstad and Oregon Governor John Kitzhaber urged Congressional leadership “…to take swift action to extend the PTC before the end of this congressional session.” Gov. Branstad (R-Ia.) is the chairman of the coalition and Gov. Kitzhaber (D-Ore.) is the vice chairman.

“Thousands of jobs in the wind industry have already been impacted by the credit’s looming expiration and thousands more are at risk,” the governors wrote. “We urge you to take swift action to extend the PTC before the end of this congressional session.”

Comments (0)

This post does not have any comments. Be the first to leave a comment below.


Post A Comment

You must be logged in before you can post a comment. Login now.

Featured Product

OMCO Origin® Factory-Direct Trackers

OMCO Origin® Factory-Direct Trackers

A One-In-Portrait (1P) solution that support a wide range of solar projects (utility scale, distributed generation (DG), & C&I markets). Manufactured and factory preassembled in the USA at one of OMCO Solar's 5 US plants (AZ, IN, AL, OH), OMCO makes all structural components with domestic steel and now can offer a 100% domestic tracker. OMCO Origin® Factory-Direct Trackers include universal module mounts with options for all commercially available modules, labor-saving bearings with 6 adjustable ways to compensate for posts and terrain issues, and foundation solutions for every terrain including OMCO C Piles.