Recycling firm unveils city's first commercial wind turbine

As the wind whipped off the East River Wednesday morning, Sims Municipal Recycling officially launched the city's tallest and only commercial-scale wind turbine, at its recycling center in Sunset Park, Brooklyn.
 
The 160-foot-tall turbine has the capacity to produce 100 kilowatts, or 4 percent of Sims' power needs. Built by Northern Power Systems, the turbine cost roughly $750,000.
 
Tom Outerbridge, Sims' general manager for recycling, said he hoped the turbine would be the first of many for the city.
 
"On a practical level, it's offsetting our electricity costs," he said during an event to christen the turbine. "For the city, I like to think it's important that it's trying to break new ground and start to carve a path for wind projects to take off."
 
The project took roughly four years to complete, mainly because of permitting. New York State Energy and Research Development kicked in about $130,000 as part of a statewide incentive program.

Comments (0)

This post does not have any comments. Be the first to leave a comment below.


Post A Comment

You must be logged in before you can post a comment. Login now.

Featured Product

MORNINGSTAR - ReadyEdge

MORNINGSTAR - ReadyEdge

The ReadyEdgeTM (RE-1) accessory is an intelligent system controlling and reporting device meant to make monitoring your solar energy system more transparent. Enabling access to LiveViewTM 2.0 and Morningstar Solar ConnectTM, ReadyEdge provides data from all compatible Morningstar devices in your system. It is designed to be paired with the three ReadyBlock options, up to six total, with the possibility to use multiple ReadyShunts and ReadyRelays. The ReadyEdge is compatible with select Morningstar products.