Floating Solar Panel Project Due in 2016 from California Power Company

From GovTech.com:  Sonoma County, Calif.'s new public electricity supplier is turning to the sun and water — the airspace over treated sewage ponds, specifically — to generate power for local homes and businesses.
 
Under a deal signed Thursday with a San Francisco-based renewable energy developer, officials with Sonoma Clean Power, now the default electricity provider in Sonoma County, unveiled a plan to install a 12.5-megawatt solar farm on floating docks atop holding ponds operated by the county Water Agency.
 
When completed in 2016, the project, which will provide enough electricity to power 3,000 homes, will be the largest solar installation in the county.
It also will help fulfill one of Sonoma Clean Power’s central goals — to develop local sources of renewable energy for its expanding customer base, now taking in more than 160,000 residential and commercial accounts across five cities in the county.

 

Comments (0)

This post does not have any comments. Be the first to leave a comment below.


Post A Comment

You must be logged in before you can post a comment. Login now.

Featured Product

OMCO Origin® Factory-Direct Trackers

OMCO Origin® Factory-Direct Trackers

A One-In-Portrait (1P) solution that support a wide range of solar projects (utility scale, distributed generation (DG), & C&I markets). Manufactured and factory preassembled in the USA at one of OMCO Solar's 5 US plants (AZ, IN, AL, OH), OMCO makes all structural components with domestic steel and now can offer a 100% domestic tracker. OMCO Origin® Factory-Direct Trackers include universal module mounts with options for all commercially available modules, labor-saving bearings with 6 adjustable ways to compensate for posts and terrain issues, and foundation solutions for every terrain including OMCO C Piles.