Gov. Brown's renewable energy plan could boost solar, wind industries

Gov. Jerry Brown's proposal this week to significantly boost the amount of energy California derives from renewable sources could reinvigorate the state's utility-scale solar and wind industries, as well as launch another land rush in the Mojave Desert.
 
In his inaugural address, Brown didn't say how the state's Renewables Portfolio Standard could be raised to 50% by 2030 — the previous benchmark was 33% by 2020 — but his commitment was clear:
 
"This is exciting, it is bold, and it is absolutely necessary if we are to have any chance of stopping potentially catastrophic changes to our climate system," the governor said.
 
He also outlined a plan to reduce petroleum use in cars and trucks by 50% and double the energy efficiency of new buildings in the state.
 
The reverberation was instantaneous.
 
"Is it significant? Absolutely. Will it stimulate the market? Absolutely," said Jerry R. Bloom of the Los Angeles law firm Winston & Strawn, who guides renewable energy developers through the financing and permitting processes.

Comments (0)

This post does not have any comments. Be the first to leave a comment below.


Post A Comment

You must be logged in before you can post a comment. Login now.

Featured Product

POWER MAX™ Ballasted Roof Mounting System

POWER MAX™ Ballasted Roof Mounting System

Preformed Line Products introduces the POWER MAX Ballasted Roof Mounting System. The POWER MAX solar mounting system is engineered to maximize energy output on commercial flat roofs. Developed with the professional installer in mind, this system offers adjustable inter-row spacing in the field of up to 11 inches. It features 50% fewer components and a simplified design resulting in faster assembly rates and labor savings on every project. Available in a flush mount, 5˚ or 10˚ tilt or higher density dual tilt design, the POWER MAX base arrives stacked on pallets providing easier transport to the roof. Engineered as a fully ballasted, non-penetrating system, it accepts standard concrete blocks and is qualified by wind tunnel testing.