Why large-scale wind power is so hard to build

Michael McDonald, Oilprice.com via USA Today:  he Bureau of Land Management faces a problem and wants to shake up the rules around wind farm approvals. The problem is straight-forward on its face, but difficult to reconcile logically: Why are so few new large-scale wind projects being built? Despite the fact that nearly everyone – environmentalists, government regulators, and business interests –wants to build more wind farms, precious few are making it over the goal line.

Since 2009, the Obama Administration has approved 46 wind farm projects that would cover a proposed 216,356 acres of public land. Yet only 15 of these 46 projects have made it into operation. The rest are stuck in limbo with years of mandatory environmental analysis ahead or have been cancelled outright.  Cont'd...

Comments (0)

This post does not have any comments. Be the first to leave a comment below.


Post A Comment

You must be logged in before you can post a comment. Login now.

Featured Product

Quality assurance in the manufacturing industry

Quality assurance in the manufacturing industry

Efficiency and precision with CSP software. In the highly competitive world of manufacturing, quality assurance is a critical factor for success. CSP offers you state-of-the-art software solutions specifically designed to ensure the highest standards of quality assurance in the manufacturing industry.