Australian 100% green energy program

Australian think tank has developed a comprehensive water, energy and environmental infrastructure program which would save the MDB, underwrite a rapid transition to a 100% green electricity grid and provide all the water needed to reforest and rebuild its native ecosystems.

Australian engineering think tank have invested in excess of 12,000 engineering hours into the development of a comprehensive suite of solutions to underwrite the transition of the Australian electricity grid to 100% green energy within the next two decades.

The proposals cover all states and territories and a significant factor in favour of the proposal is the by-product of tens of thgousands of GL of freshwater for discharge into the MDB and other important agricultural regions.

The site presents information in GoogleEarth format for ease of use to all persons using the internet. The proposals envisage hydroelectric recharge pumping facilities for all states allowing thereby the mass electrification of the Mining Industry and for raising all green energy prodcution to true Base Load Certainty.

Featured Product

Sun Xtender® Deep Cycle AGM Batteries

Sun Xtender® Deep Cycle AGM Batteries

Sun Xtender® Deep Cycle AGM Batteries for renewable energy storage are manufactured in the USA by Concorde Battery Corporation and are built to the same demanding standards crucial to supporting the aircraft industry. To facilitate maximum conductivity & charge acceptance Sun Xtender® batteries are constructed with copper alloy corrosion free terminals & robust intercell connections. Endurance and optimal float life are achieved through plates thicker than the industry standard. Sun Xtender® Batteries' AGM maintenance free design is an ideal solution for off grid and grid tied systems.