Electric Vehicle Charging Stations Installed at UCR

Units are part of "New Grid" project supported by South Coast Air Quality Management District

RIVERSIDE, Calif. Eight electric vehicle charging stations have been installed at the University of California, Riverside as part of the College of Engineering – Center for Environmental Research and Technology's (CE-CERT) "New Grid" project.


The new charging units have "level one" and "level two" charging capability and are located in parking lots 1, 6, 15 and 30. Four additional "level two" chargers are located at the CE-CERT parking lot at 1084 Columbia Avenue in Riverside. The on-campus units are overseen by the UCR Office of Transportation and Parking Services and are part of the Chargepoint network.

According to Irma Henderson, alternative transportation program manager in Transportation and Parking Services, drivers will need to have a valid parking permit to use the space, though any permit that is valid for that time of day will be allowed, regardless of the lot that the stations are in.

"For example, the station in Lot 1 is located in the red spaces, but a person with a blue permit can park there as long as they are participating in an active charging session," Henderson said.

The cost to charge a vehicle will be $1 per hour for the first four hours, then $3 per hour thereafter.

Henderson said that UCR-affiliated individuals will be able to enter a special code into the system that will provide a $1 per hour discount at the campus charging stations, making the service free for the first four hours.

The "New Grid" project is a two-year smart grid deployment supported by the South Coast Air Quality Management District. The project involves a number of public and private partners and will include, solar arrays, advanced battery storage, vehicle charging stations, an electric trolley, and a grid management system to utilize renewable energy to charge electric vehicles efficiently.

As part of the program, 13 additional charging stations are being installed throughout the City of Riverside.

Featured Product

RBI Solar - Dahlia Has You Covered

RBI Solar - Dahlia Has You Covered

What if you could maximize the Ground Coverage Ratio (GCR) on your next project and not have to worry about the complicated variables that come with a tracker system? With a low tilt and clearance design, Dahlia® has the highest GCR of any fixed-tilt system in the marketplace. The system is available in three tilt options (7.5, 10 and 12.5 degrees) and designed to accommodate any sized PV module. The lightweight system is engineered with fewer components, several of which are shipped to job sites pre-assembled. This design feature reduces freight costs and rapidly trims the amount of on-site installation time required to complete construction. Maximizing PV coverage on a site can lead to an increase of production, which creates greater financial return for project owners. Over 100 MW of Dahlia® projects have been deployed across the United States, in regions of variable snow and wind loads. How much can Dahlia® cover and save you on your next project?