SPI 2014 - GameChange Unveiling Breakthrough Max-Span Post System at SPI: the Longest Span Racking in the Industry
October 20-23, Las Vegas Convention Center, Las Vegas, NV
NEW YORK – October 14th, 2014 – GameChange Racking today announced attendance at Solar Power International and the unveiling of the breakthrough Max-Span™ Post System at SPI, the longest span racking in the industry.
SPI Booth 2324
October 20-23
Las Vegas Convention Center, Las Vegas, NV
http://www.solarpowerinternational.com/
Features of the GC Max-Span™ Post System:
*Industry's best engineered and strongest post system
*Longest spans up to 20ft between foundations: cuts install cost
*Nesting components eliminate brackets
*Starts $0.119/watt (10 MW, 315 watt panels, 0 snow, 90 wind, NE Addl)
*Free pull test and turnkey install
*Ultra high grade G235 galvanized steel piles; HDG earth screws or helicals
*ETL/UL 2703 tested
*Bankability technical assessment by Black & Veatch
*Wind tunnel tested by industry leader CPP
Featured Product
MORNINGSTAR - ReadyEdge
The ReadyEdgeTM (RE-1) accessory is an intelligent system controlling and reporting device meant to make monitoring your solar energy system more transparent. Enabling access to LiveViewTM 2.0 and Morningstar Solar ConnectTM, ReadyEdge provides data from all compatible Morningstar devices in your system. It is designed to be paired with the three ReadyBlock options, up to six total, with the possibility to use multiple ReadyShunts and ReadyRelays. The ReadyEdge is compatible with select Morningstar products.
