SPI 2014 - GameChange Unveiling Breakthrough Max-Span Post System at SPI: the Longest Span Racking in the Industry

October 20-23, Las Vegas Convention Center, Las Vegas, NV

NEW YORK – October 14th, 2014 – GameChange Racking today announced attendance at Solar Power International and the unveiling of the breakthrough Max-Span™ Post System at SPI, the longest span racking in the industry.


SPI Booth 2324
October 20-23
Las Vegas Convention Center, Las Vegas, NV
http://www.solarpowerinternational.com/

Features of the GC Max-Span™ Post System:

*Industry's best engineered and strongest post system
*Longest spans up to 20ft between foundations: cuts install cost
*Nesting components eliminate brackets
*Starts $0.119/watt (10 MW, 315 watt panels, 0 snow, 90 wind, NE Addl)
*Free pull test and turnkey install
*Ultra high grade G235 galvanized steel piles; HDG earth screws or helicals
*ETL/UL 2703 tested
*Bankability technical assessment by Black & Veatch
*Wind tunnel tested by industry leader CPP

Featured Product

Terrasmart - Reduce Risk and Accelerate Solar Installations

Terrasmart - Reduce Risk and Accelerate Solar Installations

We push the limits in renewable energy, focusing on innovation to drive progress. Pioneering new solutions and ground-breaking technology, and smarter ways of working to make progress for our clients and the industry.