Vikram Solar successfully commissions India's first floating PV power plant

The overall system is designed to last for 25 years and produce a minimum generation of 14 MWh/year.

Baker Insurance Brokers In Andover, Is Your Source For Insurance Solutions

Baker Insurance Brokers offers a range of insurance products for area clients. The firm promises full communication and access to clients.

RedWind Consulting Partners with Nayxa Energy to Provide Wind Resource Assessment Services

Exclusive arrangement further broadens RedWind's service offering

Baker Electric Solar Partners with N. San Diego Business Chamber to Promote Think Local First

Baker Electric Solar is pleased to be a N. San Diego Business Chamber Think Local First Presenting Partner. The San Diego solar company is featured in one of the chamber's local public service announcements.

GTM Research Identifies Regulatory Developments Driving the Utility of the Future

"The rules being written today will define the business opportunities of tomorrow"

Siemens signs chartering agreement for two additional wind service operations vessels

Siemens has signed a chartering agreement with ship owner Bernhard Schulte for two new service operations vessels (SOV) to be purpose-built for the long-term service and maintenance operations of the Gemini and Sandbank/Dan Tysk offshore wind power plants in the North Sea.

IEK Group will promote LEDs at the South-East European Exhibition 'EE & RE' 2015

The rapid development in technologies over the last few years has changed the lighting industry. South-East Europe is a promising market - the growth is fuelled by the transition from conventional light sources to more efficient and healthy lighting products.

‘Smart Cities' – Exhibition and Conference for South - East Europe

11 – 13 March 2015, Sofia, Bulgaria Organizer: Via Expo

Kevin Conrad Heating & Cooling Expands Geothermal Solutions for Nantucket residents and businesses

Energy efficiency from the ground up. Kevin Conrad Heating & Cooling of Nantucket has expanded their geothermal solutions.

Morgan Advanced Materials announces ceramic capacitors

Morgan Advanced Materials (MGAM) announces its extensive range of ceramic capacitors for high voltage DC and AC and high power radio frequency (RF) applications. MGAM's line of high voltage ceramic capacitors includes high voltage encapsulated discs, live line capacitors, and voltage multiplier ass

Pacific Ethanol Stockton Plant to Install Innovative Cogeneration Technology

Cogeneration System Utilizes Waste Gas from Ethanol Production as Energy Source, Reducing Electricity Costs and Plant Emissions

BlueRock Energy and ReEnergy Enter Agreement

BlueRock Energy supporting ReEnergy with forecasting, scheduling and delivering power from Black River to Fort Drum

US Can More Than Triple Share of Renewable Energy by 2030, New IRENA Report Says

Renewable energy share of 27 per cent in enegy mix is both technically possible and cost-effective by 2030

ENEL GREEN POWER EXTENDS FRAMEWORK AGREEMENT WITH VESTAS TO DEVELOP ADDITIONAL WIND CAPACITY IN THE USA

• The agreement extension confirms EGP commitment to keep growing in the United States • The development of up to an approximate 1 GW of wind capacity under the agreements will enable EGP-NA to qualify for Production• The agreement extension confirms EGP commitment to keep growing in the United States • The development of up to an approximate 1 GW of wind capacity under the agreements will enable EGP-NA to qualify for Production Tax Credits Tax Credits

Geothermal Resources Council Welcomes New President

Paul Brophy is new President of the GRC

Records 3076 to 3090 of 19186

First | Previous | Next | Last

Featured Product

IMO Precision Controls - Keeping Solar Safe

IMO Precision Controls - Keeping Solar Safe

The IMO FireRaptor provides three forms of Solar Panel Rapid Shutdown to ZERO VOLTS in case of fire or other emergency: Manual Panel Shutdown to 0V Operated from Ground Level, Automatic Panel Shutdown to 0V at >85°C (185°F) Temperature, and an automatic Panel Shutdown to 0V on External Power Loss. The FireRaptor can be installed without any set-up and with any string inverter as its functionality is completely independent. "Plug & Play" style installation using industry standard connectors is easy, whether fitted to new installs or retrofitted to existing projects to upgrade fire safety functionality. Meeting NEC2017's regulation to switch DC current at the PV panel in under 30 seconds, FireRaptor is remains one of the safest and most effective means of isolating DC current at the source, and the only rapid shutdown with a 20 year warranty.