Research on solar energy storage under way in New Mexico

PNM, a New Mexico utility, has planned to join with two educational partners and the Sandia National Laboratories in one of a growing number of renewable-energy storage and distribution projects getting under way across the country.

PNM, a New Mexico utility, has planned to join with two educational partners and the Sandia National Laboratories in one of a growing number of renewable-energy storage and distribution projects getting under way across the country.


Federal and state governments and private companies have been budgeting millions of dollars to demonstrate cost-effective ways to store electricity generated by the sun or wind and dispatch it when needed.

The PNM project has received about $2m from the federal Department of Energy as part of the overall cost of about $6m, and the project calls for the installation of a large lead-acid battery system to store and dispatch energy generated by a 500kW solar photovoltaic array.

The Prosperity Energy Storage Project it is to be built near the master-planned community Mesa del Sol off Interstate 25, about 1.5m south of the Albuquerque International Sunport, the city's primary public airport.

The utility-scale battery system, which will have a storage capacity of 2MWh to 4MWh of electricity, is to be used for power conditioning, voltage smoothing and peak shifting, according to a Department of Energy document.

The project calls for the utility to test the system's ability to mitigate voltage fluctuations from solar or wind-generated energy.

Featured Product

OMCO Origin® Factory-Direct Trackers

OMCO Origin® Factory-Direct Trackers

A One-In-Portrait (1P) solution that support a wide range of solar projects (utility scale, distributed generation (DG), & C&I markets). Manufactured and factory preassembled in the USA at one of OMCO Solar's 5 US plants (AZ, IN, AL, OH), OMCO makes all structural components with domestic steel and now can offer a 100% domestic tracker. OMCO Origin® Factory-Direct Trackers include universal module mounts with options for all commercially available modules, labor-saving bearings with 6 adjustable ways to compensate for posts and terrain issues, and foundation solutions for every terrain including OMCO C Piles.