A single shaded panel impacts overall string production if not optimized, but optimizing every panel in the string drives up cost. Tigo Flex MLPE TS4 solution allows for selective optimization of the single shaded panel to recover lost energy and save on cost.

Improving Energy Production by 10% with Tigo's Selective Deployment
Improving Energy Production by 10% with Tigo's Selective Deployment

Contributed by | Tigo Energy

Latest research shows Selective Deployment improves energy production by 10%. Offering Flex MLPE for less than $0.02/watt!

Location: Los Gatos, California
System Size: Roof top mounted 2.3 kW
Modules: 10 Upsolar 230W Poly 60 cells 9 or 10 Tigo TS4-M (Monitoring)
Only 1 Tigo TS4-O (Optimization)

 

Problem

A single shaded panel impacts overall string production if not optimized, but optimizing every panel in the string drives up cost. Tigo Flex MLPE TS4 solution allows for selective optimization of the single shaded panel to recover lost energy and save on cost.

 

Solution

The testing lab installed 10 TS4-M covers on 10 X 230W panels, and covered 2 rows of cells on panel A10 (see pictures) to simulate shaded conditions. (See shading impact on monitoring page below)

Close-up of the shaded A10 panel with a screen mesh covering 2 rows of cells.

10 testing panels, including the shaded A10 panel with a screen mesh.

The TS4-O (optimization) unit is swapped throughout the day with the TS4-M (monitoring) unit on panel A10. The TS4-O will not only keep monitoring like the TS4-M, but also optimize the panel to bypass shading.

DC Power curve measured by external DC meter shows that selective deployment of the TS4-O cover on the shaded panel increased overall production. Peak recovery at 10%.

Thanks to a single TS4-O, the shaded panel did not impact the rest of the string’s production. Shade bypass allows the entire installation to generate 10% more energy than a traditional solar system. The test shows that Tigo® was able to gain maximum energy, and was able to save money on the O&M service by using only one (1) optimization cover out of 10.

A10 panel appears shaded on the monitoring page.

DC Power curve measured by external DC meter shows that selective deployment of the TS4-O cover on the shaded panel increased overall production.

 

The content & opinions in this article are the author’s and do not necessarily represent the views of AltEnergyMag
Tigo Energy

Tigo Energy

Tigo® is a global company founded in Silicon Valley in 2007 that combines a unique systems-level approach with expertise in semiconductors, power electronics, and solar energy. By partnering with tier 1 module and inverter manufacturers in the industry, Tigo is able to provide innovation to cost-effective multivendor PV systems with integrated and retrofitted Flex MLPE as well as communications technology to drive the cost of solar electricity down. After years of research, development, testing, and certification, Tigo brought the revolutionary TS4 Platform to market. Tigo's modular TS4 Platform can be selectively deployed with different functionalities per module at different price points utilizing Predictive IV (PIV) technology to maximize energy harvest at a minimal cost. Tigo offers PV installers, designers, OEMs, EPCs, and system owners the solution that improves return on investment at each level to reduce the O&M cost over the lifetime of any project. Today, Tigo remains the only UL-certified, multivendor MLPE rapid shutdown for residential and C&I. Tigo has operations in the USA, Central & South America, Caribbean, Europe, Japan, China, Australia, South Pacific, and the Middle East.

Other Articles

Case Study: Remedying Mismatch & Shading with Tigo’s Monitoring & Optimization Functionalities
Thanks to Tigo’s monitoring and optimizing functions, the customer observed a clear improvement in mismatch and shading production issues.
SPI 2019 - Tigo Energy
This year, Tigo will display the new TS4-A (Advanced Retrofit/Add-on) series including the new product launch of the TS4-A-2F (Fire Safety for 2 Modules) at SPI. Visit us at Booth #5347!
NEC 2017 and Rapid Shutdown
Solar professionals can best prepare for NEC 2017 rapid shutdown regulations by educating themselves about the differences between NEC 2014 & 2017, options for multivendor solutions like Tigo, and relying on certified products that compliant.
More about Tigo Energy

Comments (0)

This post does not have any comments. Be the first to leave a comment below.


Post A Comment

You must be logged in before you can post a comment. Login now.

Featured Product

Sierra Instruments, Inc.- MASTER your Flow Energy!

Sierra Instruments, Inc.- MASTER your Flow Energy!

Download Flow Energy Guide - Written by Engineers For Engineers. Learn how to save on energy costs by optimizing your facility flows that impact costs like compressed air, natural gas, steam, and hot or chilled water.