The Challenges of Measuring Flare Gas

Measuring the flow rate of flare gas is challenging because a flare is not a pure gas, but a mixture of many different gases. In order to correctly measure the flow rate of the constituent gases, the composition of the flare must be known.

Oil Versus Gas - What's Best for Business?

With climate change ever-present on the agenda, a conundrum that governments and businesses face is: 'is it possible to create a greener world, whilst still allowing businesses to thrive'?

Nine-hour energy storage requirement makes one natural gas replacement project in California tricky

Andy Colthorpe for Energy-Storage News: The requirement of nine hours of energy storage duration at a project touted as a possible replacement for a new natural gas plant in California makes it tough for the newer technology to compete on cost, an analyst has said.

Records 1 to 3 of 3

Featured Product

Experience Single Brand Simplicity with SystemEdge from OutBack Power.

Experience Single Brand Simplicity with SystemEdge from OutBack Power.

Each pre-bundled package is designed to make solar plus energy storage easy. By combining OutBack's most popular FLEXpower pre-wired systems with matched OutBack energy storage, SystemEdge takes the guesswork out of installing solar plus storage. Every SystemEdge package includes a FLEXpower factory pre-wired system, application-specific EnergyCell batteries and racking, FLEXware ICS Plus combiner and all the necessary connection hardware.